Projects
Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.
Viewing All Projects
-
Engineering
- Structural Engineering
- Chemical/Process Engineering
- Civil Engineering
- Electrical Engineering
- Environmental Engineering
- Mechanical Engineering
- Power Engineering
-
Consulting
- Construction Management
- Cost Estimating
- Cybersecurity
- CMMC
- Electric Utility Analysis
- Environmental Studies/Investigations
- Expert Witness/Testimony
- Owner's Engineer/Program Management
- Environmental Regulatory Compliance
- Privatization
- Public-Private Partnerships
- Utility Infrastructure Strategy
- Utility Optimization
projects
City of Oklahoma City
Design 66-inch Water Transmission Pipeline
This project has been under consideration for many years and reflects the comprehensive understanding and long-term planning of the City of Oklahoma (City) to address and secure the future water supply of Oklahoma City and the metropolitan area. The Guernsey...
projects
City of Ada
Water Resources Planning - Feasibility and Engineering Study
Anticipated water shortages have City officials concerned about meeting water demands now and in the future. The City water supply is currently obtained from Byrd’s Mill Spring (Arbuckle-Simpson Aquifer is the source). Guernsey was selected to address the proposed lake...
projects
Wichita and Affiliated Tribes
Travel Plaza Water Line
The Wichita and Affiliated Tribes desired to install approximately 1,700 ft. of new 6-Inch waterline from an existing City of Anadarko waterline to the Wichita Travel Plaza. The waterline is to provide water service to the proposed development of property...
projects
Confidential
Wastewater Study
Guernsey performed a study for improving the performance of the wastewater plant by modifying source stream disposition and/or additional wastewater equipment. Based on the most recent two years of operation, a sizing basis and improvement recommendations were provided. The project...
projects
Confidential
Greenhouse Gas Rule Compliance and Reporting
The monitoring plan included evaluation of specific equipment items and process units subject to EPA’s new monitoring rule, assessment of monitoring methods already in place to determine their compliance status with EPA requirements, and development of required quality assurance procedures...
projects
Confidential
Validating SPCC Plans and Design Engineering for Oil Spill Containment
These projects were implemented in response to recent changes to the Spill Prevention, Control and Countermeasures regulations. Project deliverables included: Summary report documenting the validation of the SPCC Plans highlighting actions that must be completed in order to comply with...
projects
City of Bethany
North Wellfield Expansion & Improvement Study
Specific tasks that were included in the Study include: Data collection to obtain line sizing, well capacities, pump curves and specific system layout information from City staff and available recordsDevelopment of a calibrated North Wellfield hydraulic model, using EPANet, and...
projects
Central Electric Cooperative
Central Electric Cooperative Headquarters
The new 44,128 SF facility is comprised of a new two story office for administration and support operations that have outgrown their present facility. The steel frame structure utilizes masonry...
projects
Confidential
Water Quality Study - Power Plant
The Client desired to improve the quality of water used in a Power Plant’s cooling water process. Initially, the Client requested a study to seek out the true and factual...
projects
Confidential
Strategic Water Project, Major Mid-Continent Petroleum Refinery
Guernsey was retained to help a major Mid-West petroleum refinery develop and implement a long range strategic plan to modernize, strengthen, and secure the raw water supply and delivery system...
projects
High Plains Power, Inc.
Headquarters & Warehouse
The new one story rural electric facility serves as the administrative and warehouse for High Plains Power Cooperative. It comprises of 15,698 square feet of administrative offices, conference rooms, and...
projects
FAA Mike Monroney...
Renovation of System Training Building
This project included a comprehensive renovation of electronic laboratories, classrooms and administrative spaces and exterior building/site improvements. The design was highlighted by the development of three new entry elements to...
projects
Halliburton Energy Services
Q10 Pump Warehouse
This facility is approximately 150' x 130' (19,500 sf) and is a metal building warehouse to house equipment racks for the storing of newly designed and built Q10 pumps and...
projects
PFM Group
Independent Engineering Services - District Heating and Cooling and Cogeneration Plants throughout the State of Wisconsin
Guernsey provided professional consulting services to the PFM Group for the privatization of 33 heating and power facilities in the State of Wisconsin. For each site, Guernsey prepared a Facility...
projects
Directorate of Public Works -...
Benefit-Cost Analysis - Biomass Boiler
Guernsey provided technical and economic consulting services to Fort Greely, Alaska (FGA) related to its utility systems. The owner of FGA’s privatized utility regularly proposes capital projects to meet the...
projects
Department of Defense
DoD Utility Privatization
Guernsey has been the leading utility privatization consultant to the Department of Defense for more than two decades. During that time, we’ve provided pre-award, post-award and program management support to...
projects
Numerous Electric Cooperatives
Long-Range Planning Study
Guernsey has decades of experience in preparing these studies in accordance with RUS Bulletin 1724D-101A guidelines, ensuring sound engineering and economic analysis. Our long-range plans are client-specific and consider system operating voltage, substation requirements, transmission requirements, primary feeder requirements and...
projects
USACE, Huntsville District
Long-Range Master Plan Development
Guernsey completed a two-part rapid response systems integration and utility master planning task at the MCASI. Task 1 included: Station-wide system integration study to address current use and future implementation of ESS, UMCS, FAS, MNS, and SCADA systems. Survey of...
projects
NAVFAC Mid-Atlantic
Emergency Services Center
Guernsey provided mechanical, electrical and plumbing engineering services for the design of a new 13,910 square foot single story fire station and renovation of the existing 5,525 square foot fire...
projects
Northfork Electric Cooperative
New Electric Cooperative Campus
This project includes the design and construction of a new campus for Northfork Electric Cooperative comprised of four new buildings, comprehensive site improvements, new utilities infrastructure systems, parking and landscaping...
projects
Various
University Strategic Sourcing
While working with various university clients, our team of experts prepared Strategic Sourcing Studies for the analysis of changing utility service provision from the university to an outside entity. The...
projects
CoServ Electric
Meter/Transformer Building
This facility will allow for (1) the short-term storage of new and re-claimed electrical transformers for testing, re-building and re-use and (2) the testing re-building, and re-use of electrical meters...
projects
Halliburton Energy Services
Unit Test Facility
Housing over 30,000 SF, the Unit Test Facility was designed and built for Halliburton to provide a high quality, efficient, and perhaps most importantly, safe environment for them to test...
projects
Oklahoma Electric Cooperative
Administration and Shop Facility
This new facility accommodates administration, maintenance and other support operations that have outgrown their present facility. The design made use of cost-effective systems for long-term durability to meet their daily...
projects
City of Enid
Enid Comprehensive Plan & Transportation Master Plan
Enid has become, and will continue to develop into, a major regional retail hub for northwestern Oklahoma. Guernsey is assisting the city with preparation of a comprehensive plan that includes: Overall project management: project communication, and cost, schedule and quality...
projects
Numerous Electric Cooperatives
Certificate of Convenience and Necessity (CCN)
One special consideration of this project was that the Public Utility Commission of Texas (PUCT) must approve all new transmission lines one mile or longer prior to construction. A CCN application was submitted for approval, which included responses to questions...
projects
National Association of...
NARUC Cyber Evaluation of Kentucky Distribution Cooperatives
In an effort designed to ensure that Kentucky distribution cooperatives that are not subject to the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) standards are instituting risk-appropriate...
projects
Oklahoma Air National Guard
Air Support Operations Squadron
The 138th Air Support Operations Squadron at Will Rogers Air National Guard Base is the training site for US Army mission requirements. When it was time to update the facility...
projects
US Army
Benefit-Cost Analysis – 15 MW Turbine
The owner of Fort Wainright’s privatized utility regularly proposes capital projects to meet the Army’s energy needs. The utility/contractor invests its capital in approved projects and is repaid over the...
projects
City of Oklahoma City,...
Consolidated Rental Car Facility
The 39-acre site was designed to accommodate nine rental car agencies in a true “common” facility. Multiple operational planning studies were developed to ensure the greatest level of operational efficiency...
projects
The Boeing Company
Boeing Office & Electronics Laboratory Facility
This project features a two-story office and lab facility that is 316,000 square feet in size, with roadways, extensive landscaping of its 40-acre site, and more than 1,200 parking spaces...
projects
American Fidelity Assurance
American Fidelity Assurance Office Renovation
There’s a reason American Fidelity Assurance consistently lands on a variety of national Best Places To Work lists. They truly go the extra square feet to give their employees a...
projects
Wichita and Affiliated Tribes
Sewer & Water Evaluation and Conceptual Site Master Plan
The Wichita and Affiliated Tribes (Wichita Tribes) recently constructed the highly utilized Wichita Travel Plaza near the intersection of Riverside Drive and State Highway 281, north of Anadarko. Although the...
projects
Absentee Shawnee Tribe
Comprehensive Water Management Plan
The plan is for 12,500-acres of tribal land located in central Oklahoma. Water resources contained within tribal boundaries include: the North Canadian River, Littler River, the Canadian River, Lake Thunderbird tributaries, Garber-Wellington Aquifer, Vamoose-Ada Aquifer, North Canadian River Alluvial Aquifer...
projects
City of Oklahoma City/NBA Team
NBA Outdoor Practice Facility
Located adjacent to their indoor practice facility, the outdoor facility includes: Training pool, including pool equipment room Running hill with synthetic turf for cardio training Sandpit with perimeter sand catchers...
projects
Maple Leaf Sports &...
The BioSteel Centre – Toronto Raptors Practice Facility
Guernsey teamed with Toronto based engineering consultants to design the new Toronto Raptors Practice Facility in Toronto, Ontario, Canada. The 69,000-square-foot facility is one of the premier practice facilities in...
projects
Oklahoma Department of...
Hazardous Material Survey
The Osage Power Plant was constructed in 1919, and owned and operated by OG&E, until it was purchased by Osage Properties in 1986. They began abatement activities one year later...
projects
Department of the Navy
Comprehensive Electrical Utility Analysis
CDM Smith was awarded an IDIQ contract, and selected Guernsey as their partner in conducting a comprehensive electrical utility analysis of the existing system. Secondarily, the contract included developing a...
projects
Kyo-Ya Management Company,...
Feasibility Assessment – Waikiki Seawater District Cooling
Kyo-Ya Management Company came to us for a technical and economic feasibility analysis of a proposed seawater-district cooling project for some of the area’s major commercial facilities. Our analysis included...
projects
Confidential
On-Site Design and Construction Management Services of Multi-Year Remediation Program
Our extensive background in groundwater recovery and petroleum refining operations was key in providing the technical oversight for a series of projects addressing water contamination. We worked with the engineering...
projects
PetroChina Company Limited
Environmental Strategic Master Plan
PetroChina’s plan, which covered the corporate level and all four major operating departments, addressed all applicable environmental issues company-wide and delineated the infrastructure needed to effectively manage those issues.The plan was structured as follows: Develop a comprehensive set of performance...
projects
Oklahoma Corporation...
Subsurface Soil and Groundwater Investigations and Remediation
We initially installed a series of groundwater monitoring wells, or MWs, at the site to obtain soil and groundwater samples for lab analysis. During the investigation, we encountered roughly three feet of free-phase hydrocarbons in the groundwater; in the end...
projects
INTEGRIS Health
INTEGRIS Nazih Zuhdi Transplant Institute – Renovation & Relocation
The INTEGRIS Nazih Zuhdi Transplant Institute is one of Oklahoma’s leaders in the organ transplant field. Throughout this project, we sought to translate the strength and innovation the institute’s name...
projects
American Fidelity
Saints on Site
The firm negotiated a partnership with local healthcare provider St. Anthony to build a Saints on Site clinic on the building’s main floor, near the lobby, to ensure convenience for...
projects
INTEGRIS Health
INTEGRIS Heart Hospital – Entrance and Lobby Renovation
INTEGRIS launched this project to address both the branding and patient flow challenges presented by the facility’s location within an existing on-campus medical building. To improve the patient process, from...