Guernsey has decades of experience in preparing these studies in accordance with RUS Bulletin 1724D-101A guidelines, ensuring sound engineering and economic analysis. Our long-range plans are client-specific and consider system operating voltage, substation requirements, transmission requirements, primary feeder requirements and general circuit configurations.

Additional study components include:

  • Analyze existing system
  • Forecast long-range loads
  • Analyze existing system under projected loads
  • Develop cost estimates for recommended improvements
  • Analyze economics of alternative solutions
  • Develop intermediate system design
  • Evaluate environmental issues
  • Publish long-range planning study