Long-Range Planning Study
Guernsey has decades of experience in preparing these studies in accordance with RUS Bulletin 1724D-101A guidelines, ensuring sound engineering and economic analysis. Our long-range plans are client-specific and consider system operating voltage, substation requirements, transmission requirements, primary feeder requirements and general circuit configurations.
Additional study components include:
- Analyze existing system
- Forecast long-range loads
- Analyze existing system under projected loads
- Develop cost estimates for recommended improvements
- Analyze economics of alternative solutions
- Develop intermediate system design
- Evaluate environmental issues
- Publish long-range planning study