Projects

Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.

projects

City of Oklahoma...

Capitol Hill Library

Guernsey served as the Architect of Record for the complete renovation and expansion of the Capitol Hill Library. The site was redesigned and the entrance was relocated to provide improved...

projects

Central Texas Electric...

Central Texas Electric Cooperative

In Fredericksburg, CTEC established a new Operations and Maintenance building on a ten-acre site adjacent to their headquarters building. The new buildings relocated their linemen, dispatch, and mechanics from temporary...

projects

City of Enid

Water System Master Plan

The City of Enid (City) supplies potable water to its citizens via groundwater pumped from aquifer systems located to the west and southwest of the City. Concerns over long- term capacity and sustainability of the current well fields, treatment processes...

projects

Oklahoma Department of...

Statewide Bridge Rehabilitation

Rehabilitation consisted of the following: Re-deckingRehabilitation and overlaysBridge paintingExpansion joint repair and/or replacementStructural steel repair and/or replacement including beams, shoes, bearings, pads, rockers, etc.Bridge rail and guard rail repair and/or replacement along with other safety appurtenances and approach slab work...

projects

City of Edmond, OK

Transportation Master Plan

Guernsey along with teaming partner, Wilbur Smith Associates (WSA) out of Houston, TX was selected to develop a Master Transportation Plan for the City of Edmond (City). The plan involved recommended transportation improvements needed to accommodate travel demands through the...

projects

City of Edmond

Land Use Plan Update

The City of Edmond (City) contracted with Wilbur Smith Associates (WSA) along with Guernsey, and Howard Fairbairn Site Design to provide professional planning services to assist the City with the preparation of an updated Edmond Plan. Edmond is a community...

projects

Confidential

Engineering Study, Evaluation and Report

One Generating Station (Plant) operates a 23,000 acre-ft. man-made lake. The Plant has three gas-fired, 500-MW units. The lake dam was completed in 1968 and is 3,400 feet in length. The second Plant is located near a 149,000 acre-ft. man-made...

projects

Wyoming Water Development...

Water Master Plan Study

This master plan study addressed inventorying system components and conditions, performing hydraulic modeling of the system, analyzing system adequacy to meet current and future needs, identifying needed future improvements, providing cost estimates, and identifying funding opportunities to implement the improvements...

projects

Oklahoma Water Resources Board

Reservoir Viability Study/Evaluation

Guernsey identified all the significant historic undeveloped reservoir sites in Oklahoma (125 sites), reviewed existing information, performed a “Fatal Flaws” analysis to efficiently eliminate unsuitable candidates, and categorized the desirability of the remaining options. A total of 125 reservoir sites...

projects

Oklahoma Tourism & Recreation...

Facilities Assessment and Historic Preservation Master Plan

The assessment determined each facility’s renovation needs, developed an estimated construction cost for the recommended items in each facility, and prioritized the recommended renovations based on the funds available. Facilities assessed included log cabins and dining facilities. These structures are...

projects

Oklahoma Military Department

IDIQ Contract for On-Call Services

Guernsey provided professional environmental consultant services under two Architectural & Engineering IDIQ contracts. The work was assigned on a project-by-project basis. There were approximately 37 environmental task orders performed under these contracts. Services included: Environmental Site Assessments and Impact Statements...

projects

Oklahoma Department of...

General Environmental Services

Guernsey performed general environmental engineering services to the Oklahoma Department of Transportation. ODOT issued Task Orders on a per-project needed basis. These services included the following: corridor-wide initial site assessments (Corridor ISA’s); parcel-specific initial site assessment (Parcel ISA’s); subsurface site...

projects

Oklahoma Water Resources Board

Water Conveyance Evaluation of Alternatives for Oklahoma

Guernsey performed a study that considered three route alignments and conceptual design for alternative interconnected system routes for the Oklahoma Water Resources Board. The goal was to present viable options for potential water transfer from Lake Texoma, Eufaula Lake/Arkansas River...

projects

Oklahoma County

Storm Water Regulations Development

Oklahoma County prepared and submitted a procedure to assure compliance with the existing Storm Water Management Program (SWMP) to the Oklahoma Department of Environmental Quality (ODEQ) for approval. Guernsey assisted the County Planner in the developing the procedure by employing...

projects

Oklahoma Department of...

Environmental Clearances for Local Government & County Improvements to Roads & Bridges

Most of these clearances are addressed as categorical exclusions (CATEXs) and involve requirements for technical and field activities including biological reviews, wetlands investigations, cultural resources reconnaissance studies, and agency/tribal interface. On non-federally funded environmental clearances, Guernsey works directly with the...

projects

Central Oklahoma Water...

Brackish Groundwater Desalination Evaluation

The overall goal was to perform a feasibility study to determine if there is an opportunity for the development of a regional brackish water supply and desalination facility for an enhanced future water supply for COWRA. The study area included...

projects

Oklahoma County

Oklahoma County Jail Groundwater Investigations

Guernsey performed initial groundwater investigations and quarterly sampling for the Oklahoma County Jail. This investigation and sampling were required because sewer lines under the County Jail were corroded, which allowed sewage, including kitchen waste, to seep into the groundwater regime...

projects

Oklahoma Department of...

Environmental Clearances for County Improvements to Roads & Bridges

Most of these clearances are addressed as categorical exclusions (CATEX) and involve requirements for technical and field activities including initial site assessments (ISAs), biological reviews, wetlands investigations, cultural resources reconnaissance studies, and the potential for noise studies. On federally funded...

projects

Hobby Lobby Creative Centers

Environmental Due Diligence

These facilities generally include vacant land, commercial buildings, and religious centers. To date, Guernsey has performed over 60 Phase I Environmental Site Assessments (ESAs). The ESAs are accomplished in accordance with applicable ASTM standards and address potential site contamination, adjacent...

projects

City of Lawton

Bishop Road Fire Station No. 8

The new Bishop Road Fire Station No. 8 is approximately 16,000 square feet. The facility was designed so that building equipment and functions can be used as a training tool...

projects

CoServ

CoServ Headquarters

The existing CoServ campus in Corinth, Texas houses the headquarters building, call center, meter shop, equipment yard and training facilities. The work under this scope was the renovation of the...

projects

NAVFAC Southwest

Demo and Consolidate Naval Warfare Center, Weapons Division

Naval Air Warfare Center Weapons Division (NAWCWD) provides technical personnel and processes to perform research, development, acquisition, life cycle support of electronic warfare systems and devices, engineering, and support expertise...

projects

Louis Berger Services, LLC

Environmental Audits and Phase I Environmental Site Assessments

The facilities provided aviation fuel support services and maintenance activities for the Department of Defense. Issues included: High level environmental auditingPrevious site impact from adjacent sourcesPrevious site impact from onsite activities Underground storage tanksAbove ground storage tanksWastewater discharges from oil...

projects

USACE, Tulsa...

Water Supply Feasibility Study

After the performance of preliminary characterization studies for the region’s counties, communities, and rural water districts (population, water supply and infrastructure, water quality), it was determined a detailed feasibility study was required to address regionalization of water supply, treatment, and...

projects

USACE, Tulsa District

Phase II Master Plan and Reconnaissance

The Guernsey Team (included EDAW [now AECOM] and Alaback & Associates) prepared the Phase II Master Plan and Preliminary Reconnaissance for the Arkansas River Corridor through the Tulsa, OK metropolitan area. The Plan was developed in conjunction with the Vision...

projects

City of Aurora

Freedom Memorial

The design for the Colorado Freedom Memorial is derived through a series of symbolic and representative metaphors that are intended to create a dynamic and meaningful experience for the visitor...

projects

Tri-County Electric...

Tri-County Electric Cooperative Headquarters

Tri-County Electric Cooperative chose to build a new campus after acquiring another energy cooperative’s territory. Spread out over multiple locations, they were in need of consolidation to help their business...

projects

Dixie Power Electric...

Dixie Power Electric Cooperative

While the local community is an important part of any cooperative’s mission, Dixie Power takes their commitment to the city of St. George, Utah way beyond what many might expect...

projects

INTEGRIS Health

INTEGRIS Canadian Valley Hospital

The INTEGRIS Canadian Valley Hospital brings the quality services of INTEGRIS to Yukon through their 40‑bed satellite facility. Guernsey continues to support the efforts of healthcare providers in their goal...

projects

USACE Fort Worth District

Design Build Athletic Stadium

The new stadium site was located in the southwest corner of the base and presented many challenges to the team including storm water management, existing utilities, and coordination with new overhead power distribution lines being installed concurrently with this project...

projects

Oklahoma City Airport Trust

Senior Lien Mechanical System Replacements FY11

Guernsey was contracted by the Oklahoma City Airport Trust to define design requirements and develop construction documents for the replacement of mechanical systems at approximately fifteen buildings at the Mike...

projects

City of Stillwater

Stillwater Transportation Enhancement Plan (STEP)

In addition to population growth within the City, there are a large number of commuters from neighboring communities who travel to and from the City on a daily basis for employment, shopping and educational purposes. Guernsey and teaming partner Wilbur...

projects

City of Owasso

Transportation Master Plan

Guernsey prepared a Master Transportation Plan (TMP) for the City of Owasso. The study area consisted of approximately 16 square miles. The TMP is a 5, 10, 15 and 20-year transportation planning document that provides a framework for addressing the...

projects

City of Oklahoma City

48-Inch Water Transmission Main from BPS #9 to BPS #28

This water main will allow water from the Draper service area to be transmitted to the Hefner service area and vice versa. The design included steel pipe as the base bid and ductile iron pipe as the alternate bid. The...

projects

City of Purcell

Green Avenue Enhancements, Streetscape, and Complete Streets

Guernsey’s Master Plan envisions lighting improvements, landscaping, irrigation, pedestrian crosswalks, sidewalks, and gateway features. Guernsey developed a schematic design for the entire corridor from North I-35 ramps to the South I-35 ramps, and additional three miles. The City of Purcell...

projects

Oklahoma City Airport Trust

Senior Lien Mechanical System Replacements FY12-13

This project was broken into four separate projects over four calendar years: FY11, FY12, FY13 and FY14. The FY12 and FY13 projects focused on replacing the mechanical systems replacements at...

projects

City of Ada

Water Resources Planning - Feasibility and Engineering Study

Anticipated water shortages have City officials concerned about meeting water demands now and in the future. The City water supply is currently obtained from Byrd’s Mill Spring (Arbuckle-Simpson Aquifer is the source). Guernsey was selected to address the proposed lake...

projects

Wichita and Affiliated Tribes

Travel Plaza Water Line

The Wichita and Affiliated Tribes desired to install approximately 1,700 ft. of new 6-Inch waterline from an existing City of Anadarko waterline to the Wichita Travel Plaza. The waterline is to provide water service to the proposed development of property...

projects

City of Oklahoma City

Design 66-inch Water Transmission Pipeline

This project has been under consideration for many years and reflects the comprehensive understanding and long-term planning of the City of Oklahoma (City) to address and secure the future water supply of Oklahoma City and the metropolitan area. The Guernsey...

projects

City of Bethany

North Wellfield Expansion & Improvement Study

Specific tasks that were included in the Study include: Data collection to obtain line sizing, well capacities, pump curves and specific system layout information from City staff and available recordsDevelopment of a calibrated North Wellfield hydraulic model, using EPANet, and...

projects

NAVFAC Southwest

Renovation of Bachelor Enlisted Quarters B-21, B-22, and B-23

The purpose of these major renovation projects was to provide an aesthetically pleasing, functional, and safe environment for the enlisted military personnel at Naval Base Ventura County, Pt Mugu, California. Guernsey was the lead design firm for this project and...

projects

Confidential

Validating SPCC Plans and Design Engineering for Oil Spill Containment

These projects were implemented in response to recent changes to the Spill Prevention, Control and Countermeasures regulations. Project deliverables included: Summary report documenting the validation of the SPCC Plans highlighting actions that must be completed in order to comply with...

projects

USACE Tulsa

Air Base Wing Headquarters Relocation

Building 460 at Tinker AFB was occupied by the Judge Advocate General (JAG) corps. The building was determined to be deficient and unable to be feasibly updated to current codes. This project relocated the 72nd Air Base Wing (ABW) Headquarters...

projects

Confidential

Water Quality Study - Power Plant

The Client desired to improve the quality of water used in a Power Plant’s cooling water process. Initially, the Client requested a study to seek out the true and factual...

projects

Confidential

Strategic Water Project, Major Mid-Continent Petroleum Refinery

Guernsey was retained to help a major Mid-West petroleum refinery develop and implement a long range strategic plan to modernize, strengthen, and secure the raw water supply and delivery system...

projects

High Plains Power, Inc.

Headquarters & Warehouse

The new one story rural electric facility serves as the administrative and warehouse for High Plains Power Cooperative. It comprises of 15,698 square feet of administrative offices, conference rooms, and...

projects

FAA Mike Monroney...

Renovation of System Training Building

This project included a comprehensive renovation of electronic laboratories, classrooms and administrative spaces and exterior building/site improvements. The design was highlighted by the development of three new entry elements to...

projects

Halliburton Energy Services

Q10 Pump Warehouse

This facility is approximately 150' x 130' (19,500 sf) and is a metal building warehouse to house equipment racks for the storing of newly designed and built Q10 pumps and...

projects

Halliburton Energy Services

Unit Test Facility

Housing over 30,000 SF, the Unit Test Facility was designed and built for Halliburton to provide a high quality, efficient, and perhaps most importantly, safe environment for them to test...

projects

CoServ Electric

Meter/Transformer Building

This facility will allow for (1) the short-term storage of new and re-claimed electrical transformers for testing, re-building and re-use and (2) the testing re-building, and re-use of electrical meters...