Projects

Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.

projects

Tinker Air Force Base

Rotor Shop Renovation

This project renovated the existing NDI Shop located in Building 3001 at Tinker Air Force Base in Oklahoma City. The design provided new rinse booths, renovated the existing drying oven...

projects

NAVFAC Southwest

Demo and Consolidate Naval Warfare Center, Weapons Division

Naval Air Warfare Center Weapons Division (NAWCWD) provides technical personnel and processes to perform research, development, acquisition, life cycle support of electronic warfare systems and devices, engineering, and support expertise...

projects

US Army Engineering and...

Dugway Standby Generator Replacement, Dugway Proving Grounds

The project was initiated with an extensive survey by the multi-discipline team including security; mechanical, electrical, and structural engineers as well an architect. Existing conditions and the location of major components were documented through field notes and digital photographs. The...

projects

Louis Berger Services, LLC

Environmental Audits and Phase I Environmental Site Assessments

The facilities provided aviation fuel support services and maintenance activities for the Department of Defense. Issues included: High level environmental auditingPrevious site impact from adjacent sourcesPrevious site impact from onsite activities Underground storage tanksAbove ground storage tanksWastewater discharges from oil...

projects

USACE, Tulsa...

Water Supply Feasibility Study

After the performance of preliminary characterization studies for the region’s counties, communities, and rural water districts (population, water supply and infrastructure, water quality), it was determined a detailed feasibility study was required to address regionalization of water supply, treatment, and...

projects

USACE, Tulsa District

Phase II Master Plan and Reconnaissance

A variety of planning activities were addressed relating to 42 miles of the river system (84 miles of river bank) from the Keystone Dam to the Tulsa County/Wagoner County line. The main focus of Phase II included: Characterize the conditions...