Validating SPCC Plans and Design Engineering for Oil Spill Containment

These projects were implemented in response to recent changes to the Spill Prevention, Control and Countermeasures regulations. Project deliverables included:

  • Summary report documenting the validation of the SPCC Plans highlighting actions that must be completed in order to comply with the updates of the SPCC regulations
  • Provide a detailed engineering design, including PS&E