Wastewater Study

Guernsey provided professional engineering services to a refinery located in Corpus Christi, Texas. The refinery has maintained environmental compliance with the existing east plant wastewater infrastructure, but has had issues with both primary and secondary oil-water separation and elevated total suspended solids in the effluent.

Guernsey performed a study for improving the performance of the wastewater plant by modifying source stream disposition and/or additional wastewater equipment. Based on the most recent two years of operation, a sizing basis and improvement recommendations were provided.

The project included the following tasks:

The final comprehensive report included the basis for evaluation, results of the capacity analysis, and the recommended upgrades.