Central Electric Cooperative Headquarters
The new 44,128 SF facility is comprised of a new two story office for administration and support operations that have outgrown their present facility. The steel frame structure utilizes masonry veneer, EIFS and cast stone, insulated walls and windows. The roof structure is light gauge metal trusses with a standing seam metal roof system. The building is fully sprinklered and meets the cooperative’s daily operational needs necessary to provide electrical power distribution to their customers.
The facility consists of:
• Secured access for staff with security card readers
• Central park comprised of native landscaping
• Indirect natural lighting from full height windows
• Space planning to allow for future expansion
• Provided electrical/data/comm. for facility
• Provided full generator backup for power outages
• Construction administration services were provided
• Spray foam and rigid insulation for high R-value and air tightness
• Stand alone drive thru payment kiosk
• Covered outdoor terrace overlooks the park
• Green campus master plan concept
• State of the art audio visual systems
• Geothermal mechanical system
Project facts:
• LEED Gold certified facility
• Storm hardened dispatch area for inclement weather
• Pond utilizes rainwater harvesting for landscape irrigation
• Symmetrical design on a 142 degree central axis
• 56 foot tall entry tower