Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.

Project

Oklahoma Department of...

Environmental Clearances for Local Government & County Improvements to Roads & Bridges

Most of these clearances are addressed as categorical exclusions (CATEXs) and involve requirements for technical and field activities including biological reviews, wetlands investigations, cultural resources reconnaissance studies, and agency/tribal interface. On non-federally funded environmental clearances, Guernsey works directly with the...

Project

Louis Berger Services, LLC

Environmental Audits and Phase I Environmental Site Assessments

The facilities provided aviation fuel support services and maintenance activities for the Department of Defense. Issues included: High level environmental auditingPrevious site impact from adjacent sourcesPrevious site impact from onsite activities Underground storage tanksAbove ground storage tanksWastewater discharges from oil...

Project

USACE, Tulsa...

Water Supply Feasibility Study

After the performance of preliminary characterization studies for the region’s counties, communities, and rural water districts (population, water supply and infrastructure, water quality), it was determined a detailed feasibility study was required to address regionalization of water supply, treatment, and...

Project

USACE, Tulsa District

Phase II Master Plan and Reconnaissance

The Guernsey Team (included EDAW [now AECOM] and Alaback & Associates) prepared the Phase II Master Plan and Preliminary Reconnaissance for the Arkansas River Corridor through the Tulsa, OK metropolitan area. The Plan was developed in conjunction with the Vision...

Project

USACE Fort Worth District

Design Build Athletic Stadium

The existing athletic stadium at Fort Hood, TX was demolished to make way for the new Carl R. Darnall Army Hospital. Guernsey served as the Designer of Record for this design-build new replacement Athletic Stadium. The new stadium site was...

Project

Confidential

Validating SPCC Plans and Design Engineering for Oil Spill Containment

These projects were implemented in response to recent changes to the Spill Prevention, Control and Countermeasures regulations. Project deliverables included: Summary report documenting the validation of the SPCC Plans highlighting actions that must be completed in order to comply with...

Project

Wichita and Affiliated Tribes

Travel Plaza Water Line

The Wichita and Affiliated Tribes desired to install approximately 1,700 ft. of new 6-Inch waterline from an existing City of Anadarko waterline to the Wichita Travel Plaza. The waterline is to provide water service to the proposed development of property...

Project

City of Ada

Water Resources Planning - Feasibility and Engineering Study

Anticipated water shortages have City officials concerned about meeting water demands now and in the future. The City water supply is currently obtained from Byrd’s Mill Spring (Arbuckle-Simpson Aquifer is the source). Guernsey was selected to address the proposed lake...

Project

City of Oklahoma City

Design 66-inch Water Transmission Pipeline

This project represents the ultimate realization of conveying additional water from southeast Oklahoma to central Oklahoma. It will have long-term benefits for Oklahoma City and surrounding communities. This project has been under consideration for many years and reflects the comprehensive...

Project

City of Bethany

North Wellfield Expansion & Improvement Study

Specific tasks that were included in the Study include: Data collection to obtain line sizing, well capacities, pump curves and specific system layout information from City staff and available recordsDevelopment of a calibrated North Wellfield hydraulic model, using EPANet, and...

Project

City of Stillwater

Stillwater Transportation Enhancement Plan (STEP)

In addition to population growth within the City, there are a large number of commuters from neighboring communities who travel to and from the City on a daily basis for employment, shopping and educational purposes. Guernsey and teaming partner Wilbur...

Project

City of Purcell

Green Avenue Enhancements, Streetscape, and Complete Streets

Guernsey’s Master Plan envisions lighting improvements, landscaping, irrigation, pedestrian crosswalks, sidewalks, and gateway features. Guernsey developed a schematic design for the entire corridor from North I-35 ramps to the South I-35 ramps, and additional three miles. The City of Purcell...

Project

Oklahoma City Airport Trust

Senior Lien Mechanical System Replacements FY11

Guernsey was contracted by the Oklahoma City Airport Trust to define design requirements and develop construction documents for the replacement of mechanical systems at approximately fifteen buildings at the Mike...

Project

Oklahoma City Airport Trust

Senior Lien Mechanical System Replacements FY12-13

This project was broken into four separate projects over four calendar years: FY11, FY12, FY13 and FY14. The FY12 and FY13 projects focused on replacing the mechanical systems replacements at...

Project

USACE Tulsa

Air Base Wing Headquarters Relocation

Building 460 at Tinker AFB was occupied by the Judge Advocate General (JAG) corps. The building was determined to be deficient and unable to be feasibly updated to current codes. This project relocated the 72nd Air Base Wing (ABW) Headquarters...

Project

NAVFAC Southwest

Renovation of Bachelor Enlisted Quarters B-21, B-22, and B-23

The purpose of these major renovation projects was to provide an aesthetically pleasing, functional, and safe environment for the enlisted military personnel at Naval Base Ventura County, Pt Mugu, California. Guernsey was the lead design firm for this project and...

Project

Confidential

Water Quality Study - Power Plant

The Client desired to improve the quality of water used in a Power Plant’s cooling water process. Initially, the Client requested a study to seek out the true and factual...

Project

Confidential

Strategic Water Project, Major Mid-Continent Petroleum Refinery

Guernsey was retained to help a major Mid-West petroleum refinery develop and implement a long range strategic plan to modernize, strengthen, and secure the raw water supply and delivery system...

Project

High Plains Power, Inc.

Headquarters & Warehouse

The new one story rural electric facility serves as the administrative and warehouse for High Plains Power Cooperative. It comprises of 15,698 square feet of administrative offices, conference rooms, and...

Project

FAA Mike Monroney...

Renovation of System Training Building

This project included a comprehensive renovation of electronic laboratories, classrooms and administrative spaces and exterior building/site improvements. The design was highlighted by the development of three new entry elements to...

Project

Oklahoma Electric Cooperative

Administration and Shop Facility

This new facility accommodates administration, maintenance and other support operations that have outgrown their present facility. The design made use of cost-effective systems for long-term durability to meet their daily...

Project

Northfork Electric Cooperative

New Electric Cooperative Campus

This project includes the design and construction of a new campus for Northfork Electric Cooperative comprised of four new buildings, comprehensive site improvements, new utilities infrastructure systems, parking and landscaping...

Project

CoServ Electric

Meter/Transformer Building

This facility will allow for (1) the short-term storage of new and re-claimed electrical transformers for testing, re-building and re-use and (2) the testing re-building, and re-use of electrical meters...

Project

Halliburton Energy Services

Unit Test Facility

Housing over 30,000 SF, the Unit Test Facility was designed and built for Halliburton to provide a high quality, efficient, and perhaps most importantly, safe environment for them to test...

Project

City of Enid

Enid Comprehensive Plan & Transportation Master Plan

Enid has become, and will continue to develop into, a major regional retail hub for northwestern Oklahoma. Guernsey is assisting the city with preparation of a comprehensive plan that includes: Overall project management: project communication, and cost, schedule and quality...

Project

Oklahoma Air National Guard

Air Support Operations Squadron

The 138th Air Support Operations Squadron at Will Rogers Air National Guard Base is the training site for US Army mission requirements. When it was time to update the facility...

Project

City of Oklahoma City,...

Consolidated Rental Car Facility

The 39-acre site was designed to accommodate nine rental car agencies in a true “common” facility. Multiple operational planning studies were developed to ensure the greatest level of operational efficiency...

Project

The Boeing Company

Boeing Office & Electronics Laboratory Facility

This project features a two-story office and lab facility that is 316,000 square feet in size, with roadways, extensive landscaping of its 40-acre site, and more than 1,200 parking spaces...

Project

American Fidelity Assurance

American Fidelity Assurance Office Renovation

There’s a reason American Fidelity Assurance consistently lands on a variety of national Best Places To Work lists. They truly go the extra square feet to give their employees a...

Project

Wichita and Affiliated Tribes

Sewer & Water Evaluation and Conceptual Site Master Plan

The Wichita and Affiliated Tribes (Wichita Tribes) recently constructed the highly utilized Wichita Travel Plaza near the intersection of Riverside Drive and State Highway 281, north of Anadarko. Although the...

Project

Absentee Shawnee Tribe

Comprehensive Water Management Plan

The plan is for 12,500-acres of tribal land located in central Oklahoma. Water resources contained within tribal boundaries include: the North Canadian River, Littler River, the Canadian River, Lake Thunderbird tributaries, Garber-Wellington Aquifer, Vamoose-Ada Aquifer, North Canadian River Alluvial Aquifer...

Project

City of Oklahoma City/NBA Team

NBA Outdoor Practice Facility

Located adjacent to their indoor practice facility, the outdoor facility includes: Training pool, including pool equipment room Running hill with synthetic turf for cardio training Sandpit with perimeter sand catchers...

Project

Confidential

On-Site Design and Construction Management Services of Multi-Year Remediation Program

Our extensive background in groundwater recovery and petroleum refining operations was key in providing the technical oversight for a series of projects addressing water contamination. We worked with the engineering...