Projects

Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.

projects

Confidential

Engineering Study, Evaluation and Report

One Generating Station (Plant) operates a 23,000 acre-ft. man-made lake. The Plant has three gas-fired, 500-MW units. The lake dam was completed in 1968 and is 3,400 feet in length. The second Plant is located near a 149,000 acre-ft. man-made...

projects

Wyoming Water Development...

Water Master Plan Study

This master plan study addressed inventorying system components and conditions, performing hydraulic modeling of the system, analyzing system adequacy to meet current and future needs, identifying needed future improvements, providing cost estimates, and identifying funding opportunities to implement the improvements...

projects

Oklahoma Water Resources Board

Reservoir Viability Study/Evaluation

A total of 125 reservoir sites were studied and placed into five categories. Placement in the categories was based on a variety of factors. The fatal flaws analysis was a key effort. Reservoirs were exposed to a fatal flaw review...

projects

Oklahoma Tourism & Recreation...

Facilities Assessment and Historic Preservation Master Plan

The assessment determined each facility’s renovation needs, developed an estimated construction cost for the recommended items in each facility, and prioritized the recommended renovations based on the funds available. Facilities assessed included log cabins and dining facilities. These structures are...

projects

Oklahoma Military Department

IDIQ Contract for On-Call Services

The work was assigned on a project-by-project basis. There were approximately 37 environmental task orders performed under these contracts. Services included:Environmental Site Assessments and Impact Statements (NEPA)PermittingRemediation and Regulatory Compliance Lead and Asbestos InspectionsSolid/Hazardous Waste ManagementWater Resources ManagementWater & Wastewater...

projects

Oklahoma Department of...

General Environmental Services

ODOT issued Task Orders on a per-project needed basis. These services included the following: corridor-wide initial site assessments (Corridor ISA’s); parcel-specific initial site assessment (Parcel ISA’s); subsurface site investigation; remedial planning; remedial oversight and reporting; and regulatory compliance. Typical Task...