Projects
Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.
Viewing
Environmental Engineering
Projects
View All Projects
-
Engineering
- Chemical/Process Engineering
- Civil Engineering
- Electrical Engineering
- Environmental Engineering
- Mechanical Engineering
- Power Engineering
- Structural Engineering
-
Architecture
- Architectural Design
- Interior Design
- Landscape Architecture
- Master Planning
- Sustainable Design
- Urban Design/Planning
-
Consulting
- Construction Management
- Cost Estimating
- Cybersecurity
- Electric Utility Analysis
- Environmental Studies/Investigations
- Expert Witness/Testimony
- Owner's Engineer/Program Management
- Permitting/Regulatory Compliance
- Privatization
- Public-Private Partnerships
- Security Design
- Utility Infrastructure Strategy
- Utility Optimization
projects
Central Oklahoma Water...
Brackish Groundwater Desalination Evaluation
The overall goal was to perform a feasibility study to determine if there is an opportunity for the development of a regional brackish water supply and desalination facility for an enhanced future water supply for COWRA. The study area included...
projects
Oklahoma County
Oklahoma County Jail Groundwater Investigations
This investigation and sampling were required because sewer lines under the County Jail were corroded, which allowed sewage, including kitchen waste, to seep into the groundwater regime underlying the jail. Guernsey installed three monitoring wells (MWs), obtained groundwater samples from...
projects
CoServ
CoServ Headquarters
The existing CoServ campus in Corinth, Texas houses the headquarters building, call center, meter shop, equipment yard and training facilities. The work under this scope was the renovation of the...
projects
USACE, Tulsa...
Water Supply Feasibility Study
After the performance of preliminary characterization studies for the region’s counties, communities, and rural water districts (population, water supply and infrastructure, water quality), it was determined a detailed feasibility study was required to address regionalization of water supply, treatment, and...
projects
USACE, Tulsa District
Phase II Master Plan and Reconnaissance
A variety of planning activities were addressed relating to 42 miles of the river system (84 miles of river bank) from the Keystone Dam to the Tulsa County/Wagoner County line. The main focus of Phase II included: Characterize the conditions...
projects
Dixie Power Electric...
Dixie Power Electric Cooperative
While the local community is an important part of any cooperative’s mission, Dixie Power takes their commitment to the city of St. George, Utah way beyond what many might expect...