Projects
Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.
Viewing
Environmental Regulatory Compliance
Projects
View All Projects
-
Engineering
- Structural Engineering
- Chemical/Process Engineering
- Civil Engineering
- Electrical Engineering
- Environmental Engineering
- Mechanical Engineering
- Power Engineering
-
Consulting
- Construction Management
- Cost Estimating
- Cybersecurity
- CMMC
- Electric Utility Analysis
- Environmental Studies/Investigations
- Expert Witness/Testimony
- Owner's Engineer/Program Management
- Environmental Regulatory Compliance
- Privatization
- Public-Private Partnerships
- Utility Infrastructure Strategy
- Utility Optimization
projects
McAfee & Taft Attorneys at Law
Environmental Oversight & Investigations
Guernsey was contacted to be their environmental consultant and oversee all environmental investigations to be conducted at each facility. Guernsey was also asked to review environmental records associated with previous known impacts to the soil and groundwater by an adjoining...
projects
Confidential
Engineering Study, Evaluation and Report
One Generating Station (Plant) operates a 23,000 acre-ft. man-made lake. The Plant has three gas-fired, 500-MW units. The lake dam was completed in 1968 and is 3,400 feet in length. The second Plant is located near a 149,000 acre-ft. man-made...
projects
Confidential
Facility Site Characterization
Guernsey was selected by a law firm to support Gibson regarding regulatory compliance issues that could become criminal charges. Guernsey prepared an Assessment Work Plan for Gibson and submitted it to the Oklahoma Department of Environmental Quality (ODEQ). Guernsey performed...
projects
PFM Group
Phase 1 Environmental Site Assessments
Guernsey visited and evaluated 33 sites. An Independent Engineers Report (IER) was developed by Guernsey. An Environmental and Regulatory Summary based on existing permits and approvals, the limitations and requirements they place on operations and a general assessment of each...
projects
Office of Management and...
Environmental IDIQ Program
Services were assigned on a project-by-project basis by the Owner. A specific task was developed for each work order assignment. Services included: Conduct investigations, surveys, studies, reports, cost estimates, drawings, testing or other consulting services necessary for the Owner to...
projects
Oklahoma Military Department
IDIQ Contract for On-Call Services
Guernsey provided professional environmental consultant services under two Architectural & Engineering IDIQ contracts. The work was assigned on a project-by-project basis. There were approximately 37 environmental task orders performed under these contracts. Services included: Environmental Site Assessments and Impact Statements...
projects
Oklahoma Department of...
General Environmental Services
Guernsey performed general environmental engineering services to the Oklahoma Department of Transportation. ODOT issued Task Orders on a per-project needed basis. These services included the following: corridor-wide initial site assessments (Corridor ISA’s); parcel-specific initial site assessment (Parcel ISA’s); subsurface site...
projects
Oklahoma County
Storm Water Regulations Development
Oklahoma County prepared and submitted a procedure to assure compliance with the existing Storm Water Management Program (SWMP) to the Oklahoma Department of Environmental Quality (ODEQ) for approval. Guernsey assisted the County Planner in the developing the procedure by employing...
projects
Oklahoma Department of...
Environmental Clearances for Local Government & County Improvements to Roads & Bridges
Most of these clearances are addressed as categorical exclusions (CATEXs) and involve requirements for technical and field activities including biological reviews, wetlands investigations, cultural resources reconnaissance studies, and agency/tribal interface. On non-federally funded environmental clearances, Guernsey works directly with the...
projects
Central Oklahoma Water...
Brackish Groundwater Desalination Evaluation
The overall goal was to perform a feasibility study to determine if there is an opportunity for the development of a regional brackish water supply and desalination facility for an enhanced future water supply for COWRA. The study area included...
projects
Oklahoma Department of...
Environmental Clearances for County Improvements to Roads & Bridges
Most of these clearances are addressed as categorical exclusions (CATEX) and involve requirements for technical and field activities including initial site assessments (ISAs), biological reviews, wetlands investigations, cultural resources reconnaissance studies, and the potential for noise studies. On federally funded...
projects
Hobby Lobby Creative Centers
Environmental Due Diligence
These facilities generally include vacant land, commercial buildings, and religious centers. To date, Guernsey has performed over 60 Phase I Environmental Site Assessments (ESAs). The ESAs are accomplished in accordance with applicable ASTM standards and address potential site contamination, adjacent...
projects
CD Ventures, Jet Direct,...
Environmental Site Assessments
Guernsey completed about 20 Phase I’s for the industry over several years. In the overall performance of these studies, several environmental issues were identified during the due diligence process. Some of the more important issues identified included: Stormwater drainageWash bay...
projects
CoServ
CoServ Headquarters
The existing CoServ campus in Corinth, Texas houses the headquarters building, call center, meter shop, equipment yard and training facilities. The work under this scope was the renovation of the...
projects
Louis Berger Services, LLC
Environmental Audits and Phase I Environmental Site Assessments
The facilities provided aviation fuel support services and maintenance activities for the Department of Defense. Issues included: High level environmental auditingPrevious site impact from adjacent sourcesPrevious site impact from onsite activities Underground storage tanksAbove ground storage tanksWastewater discharges from oil...
projects
USACE, Tulsa...
Water Supply Feasibility Study
After the performance of preliminary characterization studies for the region’s counties, communities, and rural water districts (population, water supply and infrastructure, water quality), it was determined a detailed feasibility study was required to address regionalization of water supply, treatment, and...
projects
USACE, Tulsa District
Phase II Master Plan and Reconnaissance
The Guernsey Team (included EDAW [now AECOM] and Alaback & Associates) prepared the Phase II Master Plan and Preliminary Reconnaissance for the Arkansas River Corridor through the Tulsa, OK metropolitan area. The Plan was developed in conjunction with the Vision...
projects
Dixie Power Electric...
Dixie Power Electric Cooperative
While the local community is an important part of any cooperative’s mission, Dixie Power takes their commitment to the city of St. George, Utah way beyond what many might expect...
projects
Confidential
Greenhouse Gas Rule Compliance and Reporting
The monitoring plan included evaluation of specific equipment items and process units subject to EPA’s new monitoring rule, assessment of monitoring methods already in place to determine their compliance status with EPA requirements, and development of required quality assurance procedures...
projects
Confidential
Validating SPCC Plans and Design Engineering for Oil Spill Containment
These projects were implemented in response to recent changes to the Spill Prevention, Control and Countermeasures regulations. Project deliverables included: Summary report documenting the validation of the SPCC Plans highlighting actions that must be completed in order to comply with...
projects
Confidential
Water Quality Study - Power Plant
The Client desired to improve the quality of water used in a Power Plant’s cooling water process. Initially, the Client requested a study to seek out the true and factual...
projects
Department of Defense
DoD Utility Privatization
Guernsey has been the leading utility privatization consultant to the Department of Defense for more than two decades. During that time, we’ve provided pre-award, post-award and program management support to...
projects
Numerous Electric Cooperatives
Long-Range Planning Study
Guernsey has decades of experience in preparing these studies in accordance with RUS Bulletin 1724D-101A guidelines, ensuring sound engineering and economic analysis. Our long-range plans are client-specific and consider system operating voltage, substation requirements, transmission requirements, primary feeder requirements and...
projects
USACE, Huntsville District
Long-Range Master Plan Development
Guernsey completed a two-part rapid response systems integration and utility master planning task at the MCASI. Task 1 included: Station-wide system integration study to address current use and future implementation of ESS, UMCS, FAS, MNS, and SCADA systems. Survey of...
projects
Northfork Electric Cooperative
New Electric Cooperative Campus
This project includes the design and construction of a new campus for Northfork Electric Cooperative comprised of four new buildings, comprehensive site improvements, new utilities infrastructure systems, parking and landscaping...
projects
CoServ Electric
Meter/Transformer Building
This facility will allow for (1) the short-term storage of new and re-claimed electrical transformers for testing, re-building and re-use and (2) the testing re-building, and re-use of electrical meters...
projects
City of Enid
Enid Comprehensive Plan & Transportation Master Plan
Enid has become, and will continue to develop into, a major regional retail hub for northwestern Oklahoma. Guernsey is assisting the city with preparation of a comprehensive plan that includes: Overall project management: project communication, and cost, schedule and quality...
projects
Numerous Electric Cooperatives
Certificate of Convenience and Necessity (CCN)
One special consideration of this project was that the Public Utility Commission of Texas (PUCT) must approve all new transmission lines one mile or longer prior to construction. A CCN application was submitted for approval, which included responses to questions...
projects
The Boeing Company
Boeing Office & Electronics Laboratory Facility
This project features a two-story office and lab facility that is 316,000 square feet in size, with roadways, extensive landscaping of its 40-acre site, and more than 1,200 parking spaces...
projects
Oklahoma Department of...
Hazardous Material Survey
The Osage Power Plant was constructed in 1919, and owned and operated by OG&E, until it was purchased by Osage Properties in 1986. They began abatement activities one year later...
projects
Confidential
On-Site Design and Construction Management Services of Multi-Year Remediation Program
Our extensive background in groundwater recovery and petroleum refining operations was key in providing the technical oversight for a series of projects addressing water contamination. We worked with the engineering...
projects
PetroChina Company Limited
Environmental Strategic Master Plan
PetroChina’s plan, which covered the corporate level and all four major operating departments, addressed all applicable environmental issues company-wide and delineated the infrastructure needed to effectively manage those issues.The plan was structured as follows: Develop a comprehensive set of performance...
projects
Oklahoma Corporation...
Subsurface Soil and Groundwater Investigations and Remediation
We initially installed a series of groundwater monitoring wells, or MWs, at the site to obtain soil and groundwater samples for lab analysis. During the investigation, we encountered roughly three feet of free-phase hydrocarbons in the groundwater; in the end...