Projects
Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.
Viewing
Environmental Services
Projects
View All Projects
-
Engineering
- Structural Engineering
- Chemical/Process Engineering
- Civil Engineering
- Electrical Engineering
- Environmental Engineering
- Mechanical Engineering
- Power Engineering
-
Consulting
- Construction Management
- Cost Estimating
- Electric Utility Analysis
- Environmental Studies/Investigations
- Expert Witness/Testimony
- Owner's Engineer/Program Management
- Environmental Services
- Broadband Infrastructure Environmental Requirements
- Privatization
- Public-Private Partnerships
- Utility Infrastructure Strategy
Project
Confidential
Facility Site Characterization
Guernsey was selected by a law firm to support Gibson regarding regulatory compliance issues that could become criminal charges. Guernsey prepared an Assessment Work Plan for Gibson and submitted it to the Oklahoma Department of Environmental Quality (ODEQ). Guernsey performed...
Project
Oklahoma Department of...
Environmental Clearances for Local Government & County Improvements to Roads & Bridges
Most of these clearances are addressed as categorical exclusions (CATEXs) and involve requirements for technical and field activities including biological reviews, wetlands investigations, cultural resources reconnaissance studies, and agency/tribal interface. On non-federally funded environmental clearances, Guernsey works directly with the...
Project
CD Ventures, Jet Direct,...
Environmental Site Assessments
Since 2000, Guernsey has been involved with numerous aviation entities regarding the development of Phase I due diligence activities regarding the acquisition of facilities and assets for fixed base operators (FBOs) and related airport facilities. Guernsey completed about 20 Phase...
Project
Louis Berger Services, LLC
Environmental Audits and Phase I Environmental Site Assessments
The facilities provided aviation fuel support services and maintenance activities for the Department of Defense. Issues included: High level environmental auditingPrevious site impact from adjacent sourcesPrevious site impact from onsite activities Underground storage tanksAbove ground storage tanksWastewater discharges from oil...
Project
USACE, Tulsa...
Water Supply Feasibility Study
After the performance of preliminary characterization studies for the region’s counties, communities, and rural water districts (population, water supply and infrastructure, water quality), it was determined a detailed feasibility study was required to address regionalization of water supply, treatment, and...
Project
USACE, Tulsa District
Phase II Master Plan and Reconnaissance
The Guernsey Team (included EDAW [now AECOM] and Alaback & Associates) prepared the Phase II Master Plan and Preliminary Reconnaissance for the Arkansas River Corridor through the Tulsa, OK metropolitan area. The Plan was developed in conjunction with the Vision...
Project
Confidential
Validating SPCC Plans and Design Engineering for Oil Spill Containment
These projects were implemented in response to recent changes to the Spill Prevention, Control and Countermeasures regulations. Project deliverables included: Summary report documenting the validation of the SPCC Plans highlighting actions that must be completed in order to comply with...
Project
Confidential
Greenhouse Gas Rule Compliance and Reporting
The monitoring plan included evaluation of specific equipment items and process units subject to EPA’s new monitoring rule, assessment of monitoring methods already in place to determine their compliance status with EPA requirements, and development of required quality assurance procedures...
Project
Confidential
Water Quality Study - Power Plant
The Client desired to improve the quality of water used in a Power Plant’s cooling water process. Initially, the Client requested a study to seek out the true and factual...
Project
Numerous Electric Cooperatives
Long-Range Planning Study
Guernsey has decades of experience in preparing these studies in accordance with RUS Bulletin 1724D-101A guidelines, ensuring sound engineering and economic analysis. Our long-range plans are client-specific and consider system operating voltage, substation requirements, transmission requirements, primary feeder requirements and...
Project
Northfork Electric Cooperative
New Electric Cooperative Campus
This project includes the design and construction of a new campus for Northfork Electric Cooperative comprised of four new buildings, comprehensive site improvements, new utilities infrastructure systems, parking and landscaping...
Project
CoServ Electric
Meter/Transformer Building
This facility will allow for (1) the short-term storage of new and re-claimed electrical transformers for testing, re-building and re-use and (2) the testing re-building, and re-use of electrical meters. With the site selection predetermined by CoServ, the design team...
Project
Numerous Electric Cooperatives
Certificate of Convenience and Necessity (CCN)
One special consideration of this project was that the Public Utility Commission of Texas (PUCT) must approve all new transmission lines one mile or longer prior to construction. A CCN application was submitted for approval, which included responses to questions...
Project
The Boeing Company
Boeing Office & Electronics Laboratory Facility
This project features a two-story office and lab facility that is 316,000 square feet in size, with roadways, extensive landscaping of its 40-acre site, and more than 1,200 parking spaces...
Project
Oklahoma Department of...
Hazardous Material Survey
The Osage Power Plant was constructed in 1919, and owned and operated by OG&E, until it was purchased by Osage Properties in 1986. They began abatement activities one year later...
Project
Confidential
On-Site Design and Construction Management Services of Multi-Year Remediation Program
Our extensive background in groundwater recovery and petroleum refining operations was key in providing the technical oversight for a series of projects addressing water contamination. We worked with the engineering...
Page 1 of 1