Projects

Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.

Project

Oklahoma Department of...

Environmental Clearances for Local Government & County Improvements to Roads & Bridges

Most of these clearances are addressed as categorical exclusions (CATEXs) and involve requirements for technical and field activities including biological reviews, wetlands investigations, cultural resources reconnaissance studies, and agency/tribal interface. On non-federally funded environmental clearances, Guernsey works directly with the...

Project

USACE, Tulsa...

Water Supply Feasibility Study

After the performance of preliminary characterization studies for the region’s counties, communities, and rural water districts (population, water supply and infrastructure, water quality), it was determined a detailed feasibility study was required to address regionalization of water supply, treatment, and...

Project

USACE, Tulsa District

Phase II Master Plan and Reconnaissance

The Guernsey Team (included EDAW [now AECOM] and Alaback & Associates) prepared the Phase II Master Plan and Preliminary Reconnaissance for the Arkansas River Corridor through the Tulsa, OK metropolitan area. The Plan was developed in conjunction with the Vision...

Project

Numerous Electric Cooperatives

Long-Range Planning Study

Guernsey has decades of experience in preparing these studies in accordance with RUS Bulletin 1724D-101A guidelines, ensuring sound engineering and economic analysis. Our long-range plans are client-specific and consider system operating voltage, substation requirements, transmission requirements, primary feeder requirements and...

Project

Numerous Electric Cooperatives

Certificate of Convenience and Necessity (CCN)

One special consideration of this project was that the Public Utility Commission of Texas (PUCT) must approve all new transmission lines one mile or longer prior to construction. A CCN application was submitted for approval, which included responses to questions...

Project

National Association of...

NARUC Cyber Evaluation of Kentucky Distribution Cooperatives

In an effort designed to ensure that Kentucky distribution cooperatives that are not subject to the North American Electric Reliability Corporation (NERC) Critical Infrastructure Protection (CIP) standards are instituting risk-appropriate...

Project

Oklahoma Air National Guard

Air Support Operations Squadron

The 138th Air Support Operations Squadron at Will Rogers Air National Guard Base is the training site for US Army mission requirements. When it was time to update the facility...

Project

Oklahoma Department of...

Hazardous Material Survey

The Osage Power Plant was constructed in 1919, and owned and operated by OG&E, until it was purchased by Osage Properties in 1986. They began abatement activities one year later...