Projects
Variety is pretty much a way of life around here: We go from big to small, local to national, public to private, but always keep it person-to-person – we just haven’t found a better way of building business than through building relationships. So get to know a little of our work, and then let’s get to know one another.
Viewing
Civil Engineering
Projects
View All Projects
-
Engineering
- Structural Engineering
- Chemical/Process Engineering
- Civil Engineering
- Electrical Engineering
- Environmental Engineering
- Mechanical Engineering
- Power Engineering
-
Consulting
- Construction Management
- Cost Estimating
- Electric Utility Analysis
- Environmental Studies/Investigations
- Expert Witness/Testimony
- Owner's Engineer/Program Management
- Environmental Services
- Broadband Infrastructure Environmental Requirements
- Privatization
- Public-Private Partnerships
- Utility Infrastructure Strategy
Project
Oklahoma Department of...
Environmental Clearances for Local Government & County Improvements to Roads & Bridges
Most of these clearances are addressed as categorical exclusions (CATEXs) and involve requirements for technical and field activities including biological reviews, wetlands investigations, cultural resources reconnaissance studies, and agency/tribal interface. On non-federally funded environmental clearances, Guernsey works directly with the...
Project
Louis Berger Services, LLC
Environmental Audits and Phase I Environmental Site Assessments
The facilities provided aviation fuel support services and maintenance activities for the Department of Defense. Issues included: High level environmental auditingPrevious site impact from adjacent sourcesPrevious site impact from onsite activities Underground storage tanksAbove ground storage tanksWastewater discharges from oil...
Project
USACE, Tulsa...
Water Supply Feasibility Study
After the performance of preliminary characterization studies for the region’s counties, communities, and rural water districts (population, water supply and infrastructure, water quality), it was determined a detailed feasibility study was required to address regionalization of water supply, treatment, and...
Project
USACE, Tulsa District
Phase II Master Plan and Reconnaissance
The Guernsey Team (included EDAW [now AECOM] and Alaback & Associates) prepared the Phase II Master Plan and Preliminary Reconnaissance for the Arkansas River Corridor through the Tulsa, OK metropolitan area. The Plan was developed in conjunction with the Vision...
Project
USACE Fort Worth District
Design Build Athletic Stadium
The existing athletic stadium at Fort Hood, TX was demolished to make way for the new Carl R. Darnall Army Hospital. Guernsey served as the Designer of Record for this design-build new replacement Athletic Stadium. The new stadium site was...
Project
Confidential
Validating SPCC Plans and Design Engineering for Oil Spill Containment
These projects were implemented in response to recent changes to the Spill Prevention, Control and Countermeasures regulations. Project deliverables included: Summary report documenting the validation of the SPCC Plans highlighting actions that must be completed in order to comply with...
Project
Wichita and Affiliated Tribes
Travel Plaza Water Line
The Wichita and Affiliated Tribes desired to install approximately 1,700 ft. of new 6-Inch waterline from an existing City of Anadarko waterline to the Wichita Travel Plaza. The waterline is to provide water service to the proposed development of property...
Project
City of Ada
Water Resources Planning - Feasibility and Engineering Study
Anticipated water shortages have City officials concerned about meeting water demands now and in the future. The City water supply is currently obtained from Byrd’s Mill Spring (Arbuckle-Simpson Aquifer is the source). Guernsey was selected to address the proposed lake...
Project
City of Oklahoma City
Design 66-inch Water Transmission Pipeline
This project represents the ultimate realization of conveying additional water from southeast Oklahoma to central Oklahoma. It will have long-term benefits for Oklahoma City and surrounding communities. This project has been under consideration for many years and reflects the comprehensive...
Project
City of Bethany
North Wellfield Expansion & Improvement Study
Specific tasks that were included in the Study include: Data collection to obtain line sizing, well capacities, pump curves and specific system layout information from City staff and available recordsDevelopment of a calibrated North Wellfield hydraulic model, using EPANet, and...
Project
City of Stillwater
Stillwater Transportation Enhancement Plan (STEP)
In addition to population growth within the City, there are a large number of commuters from neighboring communities who travel to and from the City on a daily basis for employment, shopping and educational purposes. Guernsey and teaming partner Wilbur...
Project
City of Purcell
Green Avenue Enhancements, Streetscape, and Complete Streets
Guernsey’s Master Plan envisions lighting improvements, landscaping, irrigation, pedestrian crosswalks, sidewalks, and gateway features. Guernsey developed a schematic design for the entire corridor from North I-35 ramps to the South I-35 ramps, and additional three miles. The City of Purcell...
Project
Oklahoma City Airport Trust
Senior Lien Mechanical System Replacements FY11
Guernsey was contracted by the Oklahoma City Airport Trust to define design requirements and develop construction documents for the replacement of mechanical systems at approximately fifteen buildings at the Mike...
Project
Oklahoma City Airport Trust
Senior Lien Mechanical System Replacements FY12-13
This project was broken into four separate projects over four calendar years: FY11, FY12, FY13 and FY14. The FY12 and FY13 projects focused on replacing the mechanical systems replacements at...
Project
USACE Tulsa
Air Base Wing Headquarters Relocation
Building 460 at Tinker AFB was occupied by the Judge Advocate General (JAG) corps. The building was determined to be deficient and unable to be feasibly updated to current codes. This project relocated the 72nd Air Base Wing (ABW) Headquarters...
Project
NAVFAC Southwest
Renovation of Bachelor Enlisted Quarters B-21, B-22, and B-23
The purpose of these major renovation projects was to provide an aesthetically pleasing, functional, and safe environment for the enlisted military personnel at Naval Base Ventura County, Pt Mugu, California. Guernsey was the lead design firm for this project and...
Project
Confidential
Water Quality Study - Power Plant
The Client desired to improve the quality of water used in a Power Plant’s cooling water process. Initially, the Client requested a study to seek out the true and factual...
Project
Confidential
Strategic Water Project, Major Mid-Continent Petroleum Refinery
Guernsey was retained to help a major Mid-West petroleum refinery develop and implement a long range strategic plan to modernize, strengthen, and secure the raw water supply and delivery system...
Project
High Plains Power, Inc.
Headquarters & Warehouse
The new one story rural electric facility serves as the administrative and warehouse for High Plains Power Cooperative. It comprises of 15,698 square feet of administrative offices, conference rooms, and...
Project
FAA Mike Monroney...
Renovation of System Training Building
This project included a comprehensive renovation of electronic laboratories, classrooms and administrative spaces and exterior building/site improvements. The design was highlighted by the development of three new entry elements to...
Project
Oklahoma Electric Cooperative
Administration and Shop Facility
This new facility accommodates administration, maintenance and other support operations that have outgrown their present facility. The design made use of cost-effective systems for long-term durability to meet their daily...
Project
Northfork Electric Cooperative
New Electric Cooperative Campus
This project includes the design and construction of a new campus for Northfork Electric Cooperative comprised of four new buildings, comprehensive site improvements, new utilities infrastructure systems, parking and landscaping...
Project
CoServ Electric
Meter/Transformer Building
This facility will allow for (1) the short-term storage of new and re-claimed electrical transformers for testing, re-building and re-use and (2) the testing re-building, and re-use of electrical meters. With the site selection predetermined by CoServ, the design team...
Project
Halliburton Energy Services
Unit Test Facility
Housing over 30,000 SF, the Unit Test Facility was designed and built for Halliburton to provide a high quality, efficient, and perhaps most importantly, safe environment for them to test...
Project
Oklahoma Air National Guard
Air Support Operations Squadron
The 138th Air Support Operations Squadron at Will Rogers Air National Guard Base is the training site for US Army mission requirements. When it was time to update the facility...
Project
City of Oklahoma City,...
Consolidated Rental Car Facility
The 39-acre site was designed to accommodate nine rental car agencies in a true “common” facility. Multiple operational planning studies were developed to ensure the greatest level of operational efficiency...
Project
The Boeing Company
Boeing Office & Electronics Laboratory Facility
This project features a two-story office and lab facility that is 316,000 square feet in size, with roadways, extensive landscaping of its 40-acre site, and more than 1,200 parking spaces...
Project
American Fidelity Assurance
American Fidelity Assurance Office Renovation
There’s a reason American Fidelity Assurance consistently lands on a variety of national Best Places To Work lists. They truly go the extra square feet to give their employees a...
Project
Wichita and Affiliated Tribes
Sewer & Water Evaluation and Conceptual Site Master Plan
The Wichita and Affiliated Tribes (Wichita Tribes) recently constructed the highly utilized Wichita Travel Plaza near the intersection of Riverside Drive and State Highway 281, north of Anadarko. Although the...
Project
Absentee Shawnee Tribe
Comprehensive Water Management Plan
The plan is for 12,500-acres of tribal land located in central Oklahoma. Water resources contained within tribal boundaries include: the North Canadian River, Littler River, the Canadian River, Lake Thunderbird tributaries, Garber-Wellington Aquifer, Vamoose-Ada Aquifer, North Canadian River Alluvial Aquifer...
Project
City of Oklahoma City/NBA Team
NBA Outdoor Practice Facility
Located adjacent to their indoor practice facility, the outdoor facility includes: Training pool, including pool equipment room Running hill with synthetic turf for cardio training Sandpit with perimeter sand catchers...
Project
Confidential
On-Site Design and Construction Management Services of Multi-Year Remediation Program
Our extensive background in groundwater recovery and petroleum refining operations was key in providing the technical oversight for a series of projects addressing water contamination. We worked with the engineering...
Page 1 of 1